Concrete Works for the Sub-floor

I have explained in a previous post that our apartment is constructed from a steel frame clad with brickwork.  Intermediate floors were also constructed from steel, between which formwork had been placed and insitu concrete poured.  The concrete was not poured level with the top of the flange of the steel beams.  As a result, concrete […]

Read full story Comments { 0 }

Internal Wall Insulation (2)

As you can see installing the insulation takes time – most of this is spent cutting to corners and to window reveals, and ensuring all is level and plumb before the adhesive is dry. The photo for this post shows the wall insulation installed around the window to the dining room.  In the photo the […]